INSTALLATION PROCEDURE



1. Preparation




                                                                         

                                                                            Clean the ceiling surface, scratch and pill off all removable parts of old                                                                               ceiling. Mark the spots where chandeliers, spot lights, sensors,                                                                                             ventilation, etc should be installed.




​​2. Profile and assembling fixtures installation

                                                                      

                                                                               

                                                                                Profiles are fastened to the wall every 16”. All the assembling                                                                                               ventilation, electrical or other fixtures are to be fixed to the ceiling                                                                                       above the lowest point of profiles. Then check  stiffness of                                                                                                     adjusters in all the connections; if necessary, make additional                                                                                               strengthening



3. Fixing PVC fabric to profiles





                                                                               
 The PVC fabric is delivered folded up. After being deployed, it                                                                                              should be hoked to profile in several points to facilitate future                                                                                              work.



4. Stretching the ceiling





                                                                                The room should be warmed up to 70 º C by using the air forced                                                                                         heater. It makes fabric more elastic and soft. Then the fabric should                                                                                   be stretched and snapped into the profile around the perimeter .



​5. Final touch




                                                                                 Cut out holes; install the ceiling moldings, chandeliers, spotlights                                                                                        and other decorative elements. The whole process of installation                                                                                        in a room with an area of ​​400 sq ft usually takes not more than                                                                                            one working day