Installation
INSTALLATION PROCEDURE
1. Preparation
Clean the ceiling surface, scratch and pill off all removable parts of old ceiling. Mark the spots where chandeliers, spot lights, sensors, ventilation, etc should be installed.
2. Profile and assembling fixtures installation
Profiles are fastened to the wall every 16”. All the assembling ventilation, electrical or other fixtures are to be fixed to the ceiling above the lowest point of profiles. Then check stiffness of adjusters in all the connections; if necessary, make additional strengthening
3. Fixing PVC fabric to profiles
The PVC fabric is delivered folded up. After being deployed, it should be hoked to profile in several points to facilitate future work.
4. Stretching the ceiling
The room should be warmed up to 70 º C by using the air forced heater. It makes fabric more elastic and soft. Then the fabric should be stretched and snapped into the profile around the perimeter .
5. Final touch
Cut out holes; install the ceiling moldings, chandeliers, spotlights and other decorative elements. The whole process of installation in a room with an area of 400 sq ft usually takes not more than one working day